Procure 21

Contract Value: £2.1million

Demolition of an existing Primary School including asbestos removal. The main build was a traditional construction of strip foundations, brick/blockwork superstructure with beam and block ground floor and PCC planks to the first floor level, the roof was split at three levels. Firstly at two storey level over the accommodation there was a metsec curved roof, the link at ground floor level was a traditional pitch roof and finally the reception/treatment area at a high level ground floor was mono pitch Parralam timber construction. All roof finishes was kalzip with an aluminium bull nose eaves detail.

The project was unique as it was the first intermediate care facility to be built in the UK (Under the P21 Scheme).